Recent Projects
Thermal chamber performance tester
Commercial grade thermal insulation testing was required for production batches of customer containers (100% Inspection). Designed & developed system capable of testing seven units simultaneously.
R&D thermal chamber performance tester
Manual R&D testing of thermal chambers resulted in significant post-processing of data, the potential for inconsistency in data or test setup, and required waiting several days for performance results.
Machine utility measurement system
A non-invasive solution for capturing compressed airflow and cooling water flow into large machinery to validate adequate supply at final location.
SIPA machine data acquisition & analytics software
Large-scale process optimization was required on a SIPA extrusion blow molding production line.
In-line bottle wall thickness measurement system
End Customer would no longer accept product (bottles) unless 100% inspection was performed on every bottle at critical wall thickness locations.
Planetary gearbox end-of-line tester
A gearbox manufacturing line overseas required an end-of-line tester for 100% inspection to insure proper assembly.